Industry-Solutions Product-Technology News

Connection of super long reinforcement cage

分类:Industry-Solutions 766

Hoisting of section II of 24m 50 specification HRB500 reinforcement cage

 

The lower connection point at the 24m interface completes the docking.

 

48m overall connection completed

 

End to be connected at the upper part of 48m reinforcement cage
End to be connected at the lower part of 72m reinforcement cage

The overall butt joint of three 72.5m reinforcement cages is completed.

Last: Next: